The MRTA Pink Line is an elevated mass rapid transit line currently under construction in Bangkok and Nonthaburi Province, Thailand.
The monorail will be 34.5 km long with 30 stations. It will run in the northern part of the city from east Bangkok in Minburi , Bangkok along Ram Inthra Road to northwest Bangkok (Pak Kret District, Nonthaburi Province), Chaeng Watthana Road and Tiwanon Road ending at the Nonthaburi Civic Center. At the terminus there will be an interchange with MRT Purple Line and the proposed MRT Brown Line which is currently under evaluation. A short spur line to Impact, Muang Thong Thani from Si Rat station has also been proposed. The BSR joint venture won the bid to construct and operate the MRTA Pink Line.
The line will also transfer with the SRT Dark Red Line which is under construction, the BTS Sukhumvit Line extension to Khu Khot (under construction), the planned BMA Grey Line in the future and interchange with the MRT Orange Line which is under construction. As such, it will be an important cross city link in the northern area of Bangkok & Nonthaburi linking 5 lines along a major transport corridor. The line is scheduled to open in 2022.
Construction commenced in December 2017. At the end of March 2019, construction has progressed to 32.12%.
The BSR joint venture has also proposed a 2.8km spur monorail route to link to Impact, Muang Thong Thani from Si Rat station which is under consideration by the MRTA.